The builder damaged my property — claiming the collateral damage in Harrow Council

The short answer: damage beyond the work itself — a van over the lawn, a ladder through the fascia, a flooded ceiling below the bathroom — is claimable as consequential loss. Photograph immediately, get repair quotes, and add it to the main dispute rather than treating it separately.

REVIEWED BY: Sean McNamara on 2026-09-03

The evidence set

1. Same-day photos of the damage and its context (wide + close). 2. Written notification to the builder that day — one line is enough; it starts the record. 3. Two repair quotes (or the invoice if you had to fix it urgently — mitigation is recoverable when reasonable). 4. Link the damage to the work: the evidence guide disciplines apply exactly.

Where it sits in the claim

Consequential damage is a line in the schedule of loss alongside the defect remedy itself — one claim, one letter before action, one hearing. If they're insured, the insurance questions open a faster route.

Report it: the Citizens Advice consumer service passes reports to Harrow Council Trading Standards — council page (verified 2026-09-04). Unresolved: Claims up to £10,000: small claims track.

Independent information directory — not legal advice.

Source: https://www.harrow.gov.uk/business/trading-standards (verified 2026-09-04).

Reviewed by Sean McNamara · 2026-09-03 · Independent information directory — not legal advice.