The snagging log — record defects so a judge can award them

The short answer: a snagging log is one table, kept from day one: every defect, its location, the date noticed, photo numbers, and what putting it right costs. It becomes the backbone of your schedule of loss and the exhibit list at hearing.

REVIEWED BY: Sean McNamara on 2026-09-03

The table (copy this structure)

#Date noticedRoom/locationDefect (plain words)Photo #sAgreed?Remedy cost
112 MayKitchenWorktop chip 30mm near hobP4–P6No£120 (quote A)
22 JuneBathroomSealant cracked along bath — water under floorP12–P14Nosurveyor

Rules: one defect per row; photograph before touching; never delete rows (mark "remedied [date]" instead); get the builder's response in writing per row — agreement or dispute, both are evidence.

Photograph discipline

Wide shot for location, close-up for detail, something for scale (coin/tape), and keep the phone's originals — evidence guide.

From log to claim

Rows agreed → remedy deadline. Rows disputed → letter before action attaching the log. Hidden damage found later (bathroom leaks, kitchen plumbing) — add rows immediately with written notification to the builder the same day.